Today: Tuesday 15 June 2021 , 7:56 am


advertisment
search


Barren Jack Creek Water Supply Dam

Last updated 18 hour , 4 minute 36 Views

Advertisement
In this page talks about ( Barren Jack Creek Water Supply Dam ) It was sent to us on 14/06/2021 and was presented on 14/06/2021 and the last update on this page on 14/06/2021

Your Comment


Enter code
 
Barren Jack Creek Water Supply Dam is a heritage-listed dam at Burrinjuck, Yass Valley Shire, New South Wales, Australia. It was built in 1908 by the New South Wales Department of Public Works. The property is owned by Department of Planning and Infrastructure (State Government). It was added to the New South Wales State Heritage Register on 2 April 1999.

History

The Barren Jack Creek Water Supply Dam is a minor dam built to provide water supply by gravitation to the temporary settlement of Barren Jack City on a flat adjacent to the river. The settlement of Barren Jack City (later renamed Burrinjuck City) was established by New South Wales Department of Public Works to house the employees and workers engaged during the construction of Burrinjuck Dam, and was estimated to have a population of up to 2,000. Barren Jack Creek Water Supply Dam was completed on 24 December 1908, at a cost of . After the completion of Burrinjuck Dam, the settlement was inundated and the water supply dam ceased to be used. It is now not in use, and as there is no scheduled maintenance program for the structure, it is gradually being silted up.DLWC S170 Register

Description

The Barren Jack Creek Water Supply Dam was built on Barren Jack Creek close to the temporary settlement of Barren Jack City to facilitate supply of water by gravity from the dam to the settlement. The dam comprises a thin-walled cylindrical arch reinforced concrete structure built across the creek, with a capacity of impounding 4.5 million gallons of water for use. The dam has been constructed to a radius of 24.384 m (80 ft), 12.801 m (42 ft) high. The dam wall is 1.752m (5 ft 9 ins) thick at the base and is 0.609 m (2 ft) thick at the crest. On the right bank, a waste weir 4.572 m (15 ft) wide provides for the escape of surplus water. A pair of steel beam supports, being remnants of a standing platform remain at midpoint of the arch wall crest downstream side. Second-hand steel rails were used for reinforcement during the construction of the dam wall (providing about 12.4 kg/m, or 25 lb to the yard) and they appear to have provided adequate supports for the still structurally integral wall.

Condition

As at 6 December 2000, although the dam has not been used for a long time and appears to have silted up, the dam structure appears to be in good condition.

Heritage listing

The dam is associated with the construction phase of Burrinjuck Dam. It is a significant link to the community and the temporary township (now submerged under water) established by the NSW Department of Public Works during the construction phase of Burrinjuck Dam.
Barren Jack Creek Water Supply Dam was listed on the New South Wales State Heritage Register on 2 April 1999.

See also


Bibliography

  • Attribution


    Category:New South Wales State Heritage Register
    Category:Burrinjuck, New South Wales
    Category:Dams in New South Wales
    Category:Articles incorporating text from the New South Wales State Heritage Register
     
    Comments

    There are no Comments yet




    last seen
    Most vists