Pangduo Hydro Power Station

Last updated 7 Day , 10 hour 31 Views

Advertisement
In this page talks about ( Pangduo Hydro Power Station ) It was sent to us on 16/06/2021 and was presented on 16/06/2021 and the last update on this page on 16/06/2021

Your Comment


Enter code
 
The Pangduo Hydro Power Station ( ; also called the Pondo Hydro Power Station) is a reservoir and dam on the Lhasa River in Lhünzhub County to the east of Lhasa, Tibet Autonomous Region, China. The primary purposes are hydroelectric power generation and agricultural irrigation. Work started in 2008. The first turbine came into production in 2013 and the other three turbines in 2014. With annual generation capacity of 599 million kilowatt hours, it has been called the "Tibetan Three Gorges". Nevertheless, the comparison is hyperbole since the dam is only able to impound less than 1/30th that of Three Gorges.(31.9 vs 0.97 million acre-feet).

Description

sketch map
The Pangduo Dam impounds the Lhasa River in Pondo Township of Lhünzhub County, about from Lhasa.
It is at an elevation of above sea level, upstream from the 100MW Zhikong Dam at .
The objectives included hydroelectric power generation, irrigation, flood prevention and water supply.
Of these, power generation and irrigation are the main purposes.
The dam is one of a series that China has built on the Brahmaputra and its tributaries, others being the Yamdrok Hydropower Station, Nyingtri-Payi and Drikong.
The rock-fill dam impounds of water.
It is planned to irrigate of agricultural land.
The power station has total installed capacity of 160 MW, with four generating units.
The potential annual generating capacity is 599 GWh (million kilowatt hours).

Construction

The project involved a total investment of 4.569 billion yuan, or about 740 million US dollars, and has been called the "Tibetan Three Gorges".
The dam and power station were built as part of the Western Development Strategy.
Work started in 2008, and progressed on schedule.
Damming of the river stream was completed in October 2011.
The project included the world's deepest cut-off wall, at , with an axes length of .
Construction of the wall was challenging, with glacial sediments underlying flood sediments.
The construction team had to deal with the lack of oxygen at above sea level and the cold weather.
The project was due to start operating its first generator in October 2013.
The first generator set was supported by a computer monitoring system developed by the Beijing-based Institute of Water resources and Hydropower Research.
The first generating unit started operation in December 2013, with annual generation capacity of 150 million kilowatt hours.
The other three units were expected to come onstream in June 2014, bringing annual capacity to the total of 599 million kilowatt hours.
Construction is expected to be completed in 2016.

Sources




  • {{cite webref= accessdate=2015-02-05date=2011-06-14
  • title=China Valves Technology Receives Purchase Orders for Tibet Pangduo Hydro Project and South-to-North Water Diversion Project
    url=http://www.prnewswire.com/news-releases/china-valves-technology-receives-purchase-orders-for-tibet-pangduo-hydro-project-and-south-to-north-water-diversion-project-123806839.html

  • {{cite webref= url=http://www.iwhr.com/zswwenglish/Research/DomesticProjects/webinfo/2014/02/1391740989602428.htm
  • title=IWHR Supplies Monitoring System for Pangduo Hydro Projectdate=2014-02-14publisher=China Institute of Water resources and Hydropower Researchaccessdate=2015-02-05


    • {{cite journalref= url=http://chinatibet.people.com.cn/6720326.html
    • title=Tibet's biggest water-related project launcheddate=2009-08-06journal=China Tibet Onlineaccessdate=2015-02-05
    • {{cite journalref= url=http://chinatibet.people.com.cn/96069/7627577.html
    • title=Tibet's largest water project completes dammingjournal=China Tibet Onlinedate=2011-10-27accessdate=2015-02-05
    • {{cite journalref= url=http://usa.chinadaily.com.cn/china/2013-12/11/content_17167445.htmtitle='Tibet's Three Gorges Dam' starts operationdate=2013-12-11journal=China Dailyaccessdate=2015-02-05archive-url=https://web.archive.org/web/20150206054853/http://usa.chinadaily.com.cn/china/2013-12/11/content_17167445.htmarchive-date=6 February 2015url-status=dead

    • {{stack
      Category:Reservoirs and dams in Tibet
      Category:Dams in the Brahmaputra River Basin
      Category:Buildings and structures in Lhasa
      Category:Lhünzhub County
      Category:Dams in China
      Category:Hydroelectric power stations in Tibet
      Category:Dams completed in 2013
      Category:2013 establishments in China
      Category:Rock-filled dams
      Category:Energy infrastructure completed in 2013
  •  
    Comments